Client:
Isaac Plains Coal
Scope:
Coal crushing contract
Location:
Moranbah, QLD
Project Features:
The initial contract was for production of 250,000 tonnes of coal crushed to minus 50mm; this is likely to be extended to 250,000 tonnes per annum in an ongoing operation. MCG already have in place a wide range of operational procedures for the safe performance of these works. Our ability to mobilise quickly and implement the required actions for safe and efficient production is enhanced by the extensive analysis and risk mitigation carried out previously, with the integration of site specific procedures a relatively straightforward transition.
Return to MCG Quarries
|